3 photosNew borewells, cased and sealed at the surface · Telangana
Projects · Telangana
Real sites, real photos. Every one dated by the camera.
Showing 16 projects
3 photosNew borewells, cased and sealed at the surface · Telangana
3 photosDrinking-water borewells with hand pumps, tested at handover · Telangana
4 photosOur crews drilling, then lowering the casing pipe into the new bore · Telangana
4 photosRig 3 (TS 08 GV 2616) loaded with casing pipes, and Rig 2 (AP 29 B 6786), both WALTA-registered · Telangana
2 photosTwo solar arrays running the borewell pump, water flowing at the outlet · Telangana
Nov 2023
3 photosTank on a steel stand with its solar panel, filled by a pump in the borewell · Telangana
5 photosFrom foundation to steel stand, built by our own team · Telangana

RCC overhead tank for village water supply · Telangana

Village water storage, Mission Bhagiratha · Telangana

RCC overhead tank with spiral staircase, being finished by our team · Telangana
2 photosHDPE main laid with machine trenching · Telangana

GVR team on a village pipeline job · Telangana

Water main taken safely under a highway culvert · Telangana
4 photosBranch lines and a tap at every house · Telangana
Dec 2022
2 photosHDPE tee junctions and valves · Telangana

Pipeline works through a village lane · Telangana
Dec 2022